Project Description

Client: L&T Infrastructure.

Structure design: Arch

Area:540sqft.

Steel: MS epoxy coated

Paint: One coat of Epoxy primer and two coats of Epoxy paint (Asian Paint).

Fabric: 750GSM, Serge Ferrari (French) PVDF-Coated FR Fabric.

Project completion time: 20 days

Challenges:

  1. Design Complexity: Creating an arch structure can be architecturally complex, requiring precise calculations and engineering expertise. Ensuring the design meets safety standards while accommodating the aesthetic preferences of the client can be a significant challenge.
  2. Material Sourcing and Quality Assurance: Procuring the specified materials, such as MS epoxy-coated steel and high-quality PVDF-coated FR fabric, may present challenges in terms of availability, cost, and ensuring compliance with project requirements and industry standards.
  3. Weather Dependency: Weather conditions can have a substantial impact on construction projects. Working with epoxy coatings and paint, which require specific temperature and humidity conditions for proper curing, may lead to delays or quality issues if not managed effectively.
  4. Specialized Skill Set: The use of epoxy coatings and PVDF-coated fabric demands a skilled workforce with experience in handling these materials.
  5. Project Timeline: Completing the project in just 20 days can be a tight schedule, especially given the complexity of the design and the need for multiple coats of epoxy paint.

These challenges highlight the importance of thorough planning, effective project management, and a skilled workforce when undertaking a project of this nature.