Project Description
Client: Sundar Niwas CHS.
Structure design: Arch car parking structure.
Area: 1465sqft
Steel: MS epoxy coated.
Paint: One coat of Epoxy primer and two coats of Epoxy paint (Asian Paint).
Fabric: Sioen (Belgium) PVDF Coated FR fabric.
Project completion time: 20 days.
Challenges:
Designing and constructing the arch car parking structure for Sundar Niwas CHS presents several challenges that need to be addressed:
- Complex Structural Design: Designing an arch car parking structure requires careful engineering to ensure it can support the weight of vehicles and withstand environmental factors such as wind and seismic activity.
- Limited Space: The area of 1465 sqft may impose constraints on the design and layout, making it crucial to efficiently utilize the available space for parking.
- Material Sourcing and Quality Assurance: Acquiring high-quality MS epoxy coated steel and Sioen PVDF coated FR fabric is crucial for ensuring the longevity and structural integrity of the parking structure.
- Adherence to Local Codes and Regulations: Complying with local building codes, zoning regulations, and safety standards is essential to avoid legal complications and ensure the safety of users.
5. Epoxy Coating Application: Applying epoxy primer and paint requires precision and expertise to achieve a uniform, durable finish that will protect the steel from corrosion and other forms of degradation.
6. Weather Dependency: Weather conditions, such as rain or extreme temperatures, could potentially affect the construction schedule. Adequate provisions need to be made to mitigate these risks.
7. Coordination with Suppliers and Contractors: Effective communication and coordination with steel, paint, and fabric suppliers, as well as construction contractors, is vital to ensure timely delivery of materials and completion of the project within the 20-day timeframe.
8. Quality Control and Inspection: Regular inspections are necessary to verify that construction is proceeding according to design specifications and that materials are being used correctly.
9. Safety Measures: Implementing appropriate safety measures during construction to protect workers and ensure compliance with safety standards is paramount.
Addressing these challenges will require a well-coordinated effort from all parties involved, including architects, engineers, contractors, and suppliers. Open communication, diligent planning, and strict adherence to quality standards will be key to the successful completion of the Sundar Niwas CHS arch car parking structure.