


Project Description
Client: Perfect Engineering Industries.
Structure design: Conical Structure.
Area: 1200 sqft.
Steel: MS epoxy coated.
Paint: One coat of Epoxy primer and two coats of Epoxy paint (Asian Paint).
Fabric: Serge Ferrari (French) PVDF-coated FR Fabric.
Project completion time: 45 days.
Challenges:
- Fabric Sourcing and Lead Time: Obtaining the specified Serge Ferrari PVDF-coated FR Fabric may pose a challenge, especially if there are supply chain disruptions, quality issues, or lead time delays.
- Conical Structure Engineering: Designing and engineering a conical structure can be complex. Ensuring stability, load-bearing capacity, and wind resistance in a conical shape requires careful planning and expertise.
- Fabric Tensioning and Installation: Achieving the correct tension in the fabric and ensuring it fits snugly on the conical structure without wrinkles or sagging can be challenging.
- Structural Integrity: Ensuring that the conical structure is structurally sound and can withstand environmental conditions, including wind loads, snow loads, and seismic activity, is crucial.
6. Surface Preparation and Coating Application: Proper surface preparation for the MS epoxy-coated steel and the application of epoxy primer and paint requires skilled labor and adherence to strict application guidelines to prevent issues like peeling, bubbling, or uneven coating.
7. Adherence to Safety Standards: Ensuring that the construction process adheres to safety standards and regulations is vital to prevent accidents or incidents during fabrication and installation.
8. Weather Dependencies: Weather conditions can significantly impact the project timeline, especially if adverse weather conditions like heavy rain or extreme temperatures are encountered during the 45-day completion period.
9. Quality Assurance and Inspection: Ensuring that all materials, including steel, fabric, and coatings, meet the specified quality standards and conducting regular inspections throughout the project to identify and rectify any defects.
10. Coordination and Communication: Effective communication and coordination among various stakeholders, including designers, engineers, fabricators, painters, and installers, is crucial to ensure a seamless project execution.
11. Cost Management: Managing the project budget, including procurement of high-quality materials and skilled labor, while still adhering to the client’s budget constraints, can be a significant challenge.
12. Regulatory Compliance: Ensuring compliance with local building codes, environmental regulations, and industry standards for both the structural design and coating application is essential.
13. Fabric Maintenance and Longevity: The long-term durability and maintenance of the fabric, particularly in an outdoor setting, may require specific care instructions and regular inspections to identify and address any signs of wear or damage.
These challenges highlight the complexity of the project and emphasize the importance of careful planning, skilled execution, and ongoing quality control throughout the process.